documentation-criteria by shinpr
Documentation creation criteria including PRD, ADR, Design Doc, and Work Plan requirements with templates. Use when creating or reviewing technical documents, or determining which documents are required.
Content & Writing
85 Stars
23 Forks
Updated Jan 16, 2026, 04:26 AM
Why Use This
This skill provides specialized capabilities for shinpr's codebase.
Use Cases
- Developing new features in the shinpr repository
- Refactoring existing code to follow shinpr standards
- Understanding and working with shinpr's codebase structure
Install Guide
2 steps- 1
Skip this step if Ananke is already installed.
- 2
Skill Snapshot
Auto scan of skill assets. Informational only.
Valid SKILL.md
Checks against SKILL.md specification
Source & Community
Repository claude-code-workflows
Skill Version
main
Community
85 23
Updated At Jan 16, 2026, 04:26 AM
Skill Stats
SKILL.md 203 Lines
Total Files 1
Total Size 0 B
License NOASSERTION
---
name: documentation-criteria
description: Documentation creation criteria including PRD, ADR, Design Doc, and Work Plan requirements with templates. Use when creating or reviewing technical documents, or determining which documents are required.
---
# Documentation Creation Criteria
## Templates
- **[prd-template.md](references/prd-template.md)** - Product Requirements Document template
- **[adr-template.md](references/adr-template.md)** - Architecture Decision Record template
- **[design-template.md](references/design-template.md)** - Technical Design Document template
- **[plan-template.md](references/plan-template.md)** - Work Plan template
- **[task-template.md](references/task-template.md)** - Task file template for implementation tasks
## Creation Decision Matrix
| Condition | Required Documents | Creation Order |
|-----------|-------------------|----------------|
| New Feature Addition | PRD → [ADR] → Design Doc → Work Plan | After PRD approval |
| ADR Conditions Met (see below) | ADR → Design Doc → Work Plan | Start immediately |
| 6+ Files | ADR → Design Doc → Work Plan (Required) | Start immediately |
| 3-5 Files | Design Doc → Work Plan (Recommended) | Start immediately |
| 1-2 Files | None | Direct implementation |
## ADR Creation Conditions (Required if Any Apply)
### 1. Contract System Changes
- **Adding nested contracts with 3+ levels**: `Contract A { Contract B { Contract C { field: T } } }`
- Rationale: Deep nesting has high complexity and wide impact scope
- **Changing/deleting contracts used in 3+ locations**
- Rationale: Multiple location impacts require careful consideration
- **Contract responsibility changes** (e.g., DTO→Entity, Request→Domain)
- Rationale: Conceptual model changes affect design philosophy
### 2. Data Flow Changes
- **Storage location changes** (DB→File, Memory→Cache)
- **Processing order changes with 3+ steps**
- Example: "Input→Validation→Save" to "Input→Save→Async Validation"
- **Data passing method changes** (parameter passing→shared state, direct reference→event-based communication)
### 3. Architecture Changes
- Layer addition, responsibility changes, component relocation
### 4. External Dependency Changes
- Library/framework/external API introduction or replacement
### 5. Complex Implementation Logic (Regardless of Scale)
- Managing 3+ states
- Coordinating 5+ asynchronous processes
## Detailed Document Definitions
### PRD (Product Requirements Document)
**Purpose**: Define business requirements and user value
**Includes**:
- Business requirements and user value
- Success metrics and KPIs (measurable format)
- User stories and use cases
- MoSCoW prioritization (Must/Should/Could/Won't)
- MVP and Future phase separation
- User journey diagram (required)
- Scope boundary diagram (required)
**Excludes**:
- Technical implementation details (→Design Doc)
- Technical selection rationale (→ADR)
- **Implementation phases** (→Work Plan)
- **Task breakdown** (→Work Plan)
### ADR (Architecture Decision Record)
**Purpose**: Record technical decision rationale and background
**Includes**:
- Decision (what was selected)
- Rationale (why that selection was made)
- Option comparison (minimum 3 options) and trade-offs
- Architecture impact
- Principled implementation guidelines (e.g., "Use dependency injection")
**Excludes**:
- Implementation schedule, duration (→Work Plan)
- Detailed implementation procedures (→Design Doc)
- Specific code examples (→Design Doc)
- Resource assignments (→Work Plan)
### Design Document
**Purpose**: Define technical implementation methods in detail
**Includes**:
- **Existing codebase analysis** (required)
- Implementation path mapping (both existing and new)
- Integration point clarification (connection points with existing code even for new implementations)
- Technical implementation approach (vertical/horizontal/hybrid)
- **Technical dependencies and implementation constraints** (required implementation order)
- Interface and contract definitions
- Data flow and component design
- **E2E verification procedures at integration points**
- **Acceptance criteria (measurable format)**
- Change impact map (clearly specify direct impact/indirect impact/no ripple effect)
- Complete enumeration of integration points
- Data contract clarification
- **Agreement checklist** (agreements with stakeholders)
- **Code inspection evidence** (inspected files/functions during investigation)
- **Field propagation map** (when fields cross component boundaries)
- **Data representation decision** (when introducing new structures)
- **Applicable standards** (explicit/implicit classification)
- **Prerequisite ADRs** (including common ADRs)
**Required Structural Elements**:
```yaml
Change Impact Map:
Change Target: [Component/Feature]
Direct Impact: [Files/Functions]
Indirect Impact: [Data format/Processing time]
No Ripple Effect: [Unaffected features]
Interface Change Matrix:
Existing: [Function/method/operation name]
New: [Function/method/operation name]
Conversion Required: [Yes/No]
Compatibility Method: [Approach]
```
**Excludes**:
- Why that technology was chosen (→Reference ADR)
- When to implement, duration (→Work Plan)
- Who will implement (→Work Plan)
### Work Plan
**Purpose**: Implementation task management and progress tracking
**Includes**:
- Task breakdown and dependencies (maximum 2 levels)
- Schedule and duration estimates
- **Copy E2E verification procedures from Design Doc** (cannot delete, can add)
- **Phase 4 Quality Assurance Phase (required)**
- Progress records (checkbox format)
**Excludes**:
- Technical rationale (→ADR)
- Design details (→Design Doc)
**Phase Division Criteria**:
1. **Phase 1: Foundation Implementation** - Contract definitions, interfaces/signatures, test preparation
2. **Phase 2: Core Feature Implementation** - Business logic, unit tests
3. **Phase 3: Integration Implementation** - External connections, presentation layer
4. **Phase 4: Quality Assurance (Required)** - Acceptance criteria achievement, all tests passing, quality checks
**Three Elements of Task Completion Definition**:
1. **Implementation Complete**: Code is functional
2. **Quality Complete**: Tests, static checks, linting pass
3. **Integration Complete**: Verified connection with other components
## Creation Process
1. **Problem Analysis**: Change scale assessment, ADR condition check
- Identify explicit and implicit project standards before investigation
2. **ADR Option Consideration** (ADR only): Compare 3+ options, specify trade-offs
3. **Creation**: Use templates, include measurable conditions
4. **Approval**: "Accepted" after review enables implementation
## Storage Locations
| Document | Path | Naming Convention | Template |
|----------|------|------------------|----------|
| PRD | `docs/prd/` | `[feature-name]-prd.md` | [prd-template.md](references/prd-template.md) |
| ADR | `docs/adr/` | `ADR-[4-digits]-[title].md` | [adr-template.md](references/adr-template.md) |
| Design Doc | `docs/design/` | `[feature-name]-design.md` | [design-template.md](references/design-template.md) |
| Work Plan | `docs/plans/` | `YYYYMMDD-{type}-{description}.md` | [plan-template.md](references/plan-template.md) |
| Task File | `docs/plans/tasks/` | `{plan-name}-task-{number}.md` | [task-template.md](references/task-template.md) |
*Note: Work plans are excluded by `.gitignore`
## ADR Status
`Proposed` → `Accepted` → `Deprecated`/`Superseded`/`Rejected`
## AI Automation Rules
- 5+ files: Suggest ADR creation
- Contract/data flow change detected: ADR mandatory
- Check existing ADRs before implementation
## Diagram Requirements
Required diagrams for each document (using mermaid notation):
| Document | Required Diagrams | Purpose |
|----------|------------------|---------|
| PRD | User journey diagram, Scope boundary diagram | Clarify user experience and scope |
| ADR | Option comparison diagram (when needed) | Visualize trade-offs |
| Design Doc | Architecture diagram, Data flow diagram | Understand technical structure |
| Work Plan | Phase structure diagram, Task dependency diagram | Clarify implementation order |
## Common ADR Relationships
1. **At creation**: Identify common technical areas (logging, error handling, async processing, etc.), reference existing common ADRs
2. **When missing**: Consider creating necessary common ADRs
3. **Design Doc**: Specify common ADRs in "Prerequisite ADRs" section
4. **Compliance check**: Verify design aligns with common ADR decisions Name Size